• Location
    SINGAPORE
    416042
  • Office Hours
    MON - FRI 8:30AM - 6PM
    SAT 8:30AM to 1PM
  •  
    6744 2661

New to site?


Login

Lost password? (close)

Already have an account?


Signup

(close)
HomeTestimonials
Home Testimonials
TESTIMONIALS
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam.
During the time we worked with FOSTA Pte Ltd on the Jurong Island Westward Extension project, we noticed that their installation procedures for structural and geotechnical instrumentation highly met the standards and adhere to the strictest compliance of safety. We definitely have to mention about their highly professional and good support teams as well.
Read Testimonial into PDF
Alvin Jayadi
Design Manager, Dredging International Asia Pacific
FOSTA Pte Ltd has provided us with efficient marine soil investigation and reporting works, geotechnical instrumentation and quality instrumentation reports. The team strictly followed the standards and procedures, reports were submitted promptly, professionally and without delay. 150% satisfied. We’ll definitely collaborate again for future projects.
Read Testimonial into PDF
Choo Yun Fah
Project Director, Muhibbah Engineering Singapore Pte Ltd.
TESTIMONIALS
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam.
  • During the time we worked with FOSTA Pte Ltd on the Jurong Island Westward Extension project, we noticed that their installation procedures for structural and geotechnical instrumentation highly met the standards and adhere to the strictest compliance of safety. We definitely have to mention about their highly professional and good support teams as well.
    Read Testimonial into PDF
    Alvin Jayadi
    Design Manager, Dredging International Asia Pacific
  • FOSTA Pte Ltd has provided us with efficient marine soil investigation and reporting works, geotechnical instrumentation and quality instrumentation reports. The team strictly followed the standards and procedures, reports were submitted promptly, professionally and without delay. 150% satisfied. We’ll definitely collaborate again for future projects.
    Read Testimonial into PDF
    Choo Yun Fah
    Project Director, Muhibbah Engineering Singapore Pte Ltd.

ReBuild, to build your constructions with few clicks

Be the first who use our wordpress theme