HomePortfolioAdvanced In-situ Tests / Cable Tunnel
Home Advanced In-situ Tests / Cable Tunnel
Advanced In-situ Tests / Cable Tunnel
Project Description

Additional Soil Investigation Works for East-West Transmission Cable Tunnel Singapore Power Ltd/Worley Parsons Pte Ltd September 2011. Soil investigations of a total of 14 boreholes of were carried out. Advanced in-situ tests, including hydraulic fracture tests and other tests, were conducted to obtain rock properties at various depths.

Details
  • Client:Singapore Power Ltd/Worley Parsons Pte Ltd
  • Location:Buona Vista, Singapore
  • Contractor:FOSTA Pte Ltd
  • Completed Year:September 2011